Project: 3618 Beijing Energy Huitengxile 49.5MW Wind Power Project - Crediting Period Renewal Request
[]
Project 3618: Beijing Energy Huitengxile 49.5MW Wind Power Project

- project design document (681 KB)

PDD appendices
Appendix 1 - 3618 RCP Huitengxile ER Calculation (94 KB)

- crediting period renewal form (151 KB)
Methodologies Used ACM0002 ver. 17 - Grid-connected electricity generation from renewable sources
VVS Version VVS-PA 1.0
Standardized baselines used N/A
Amount of Reductions 111,215 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (914 KB)
Renewal Date 27 Jan 18 (Renewable)   (view history)   completeness check: complete info & rep check: concluded
Crediting Period (requested for renewal) 24 Sep 17 - 23 Sep 24

Other crediting period(s): 24 Sep 10 - 23 Sep 17
Requests for Issuance
and related documentation