16:09 14 Sep 26
Project:
3136 Beijing Energy Huolinhe B First Phase 49.5MW Wind Farm Project
- Crediting Period Renewal Request
[]
| Project |
3136: Beijing Energy Huolinhe B First Phase 49.5MW Wind Farm Project
- project design document (744 KB)
PDD appendices Appendix 1 - Copy of ER spreadsheet-Huolinhe I (86 KB)
- crediting period renewal form (123 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 17 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS-PA 1.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 103,527 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (149 KB)
|
| Renewal Date |
29 Mar 18
(Renewable - Expired)
(view history)
completeness check: complete
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
25 Jun 17 - 24 Jun 24
Other crediting period(s): 25 Jun 10 - 24 Jun 17 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - Copy of ER spreadsheet-Huolinhe I
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: