20:01 23 Mar 26
Project:
3081 Yinqiao and Luojiaba 11.5 MW Bundled Hydropower Project in Guizhou Province
- History
| Project | 3081: Yinqiao and Luojiaba 11.5 MW Bundled Hydropower Project in Guizhou Province |
|---|---|
| Request for review |
Request 1
Request 2 Request 3 EB meeting: EB56 (at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team) Initial comments: Initial Response by DOE (274 KB)
Annex 1 - Economic Evaluation Code (2493 KB)
Annex 2 - IRR Calculation Yinqiao (with 100% electr. export) (131 KB)
Annex 3 - IRR Calculation Luojiaba (with 100% electr. export) (125 KB)
Annex 4 - Certification Letter by Shiqian County Power Supply Bureau (166 KB)
Validation Report & Protocol (ver. 3.2) (1524 KB)
Initial Response by Project Participants (61 KB)
|
Data before corrections
| CDM-PDD |
project design document (552 KB)
PDD appendices Appendix 1 - CDM-consideration (Yinqiao) (2808 KB)
Appendix 2 - CDM-consideration (Luojiaba) (2565 KB)
Appendix 3 - Investment Analysis (Yinqiao) (125 KB)
Appendix 4 - Investment Analysis (Luojiaba) (119 KB)
Appendix 5 - EF-calculation (60 KB)
|
|---|---|
| Validation Report |
Validation report (1346 KB)
|

Initial Response by DOE
Annex 2 - IRR Calculation Yinqiao (with 100% electr. export)
Appendix 1 - CDM-consideration (Yinqiao)
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: