19:23 07 Nov 26
Project:
3080 Huaneng Inner Mongolia Keyouzhongqi Gaoliban Wind Farm Project
- Crediting Period Renewal Request
[]
| Project |
3080: Huaneng Inner Mongolia Keyouzhongqi Gaoliban Wind Farm Project
- project design document (730 KB)
PDD appendices Appendix 1 - Huaneng Inner Mongolia Keyouzhongqi Gaoliban Wind Farm Project (3080)_ER sheet for RCP (16 KB)
Appendix 2 - List of documents submitted_Huaneng Inner Mongolia Keyouzhongqi Gaoliban Wind Farm Project (3080) (213 KB)
- crediting period renewal form (364 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 19 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS-PA 2.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 104,915 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (377 KB)
|
| Renewal Date |
20 Sep 19
(Renewable - Expired)
(view history)
completeness check
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
12 Apr 17 - 11 Apr 24
Other crediting period(s): 12 Apr 10 - 11 Apr 17 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - Huaneng Inner Mongolia Keyouzhongqi Gaoliban Wind Farm Project (3080)_ER sheet for RCP
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: