• Home
  • CDM
  • JI
  • CC:iNet
  • TT:Clear
CDM glossary | Sitemap | FAQ | Contact us | Disclaimer | Extranet | My CDM / Login | Join

UNFCCC

About CDM Governance Rules and Reference Methodologies Standardized Baselines Activity Search Programme of Activities (PoA) CDM co-Benefits Prior Consideration CPA Prior Consideration Validation Requests for Deviation Issuance of CERs Post-Registration Changes Renewal of crediting period CPA-PRC Activities transitioned to 6.4 CDM Registry Stakeholder Interaction Newsroom

Offset now: visit the United Nations Carbon Offset Platform

Connect with us:

twitter facebook linkedin instagram boomerang youtube
UNFCCC radio
Your location: Home > Activity Search
  18:39 04 Jun 25
Project: 4337 Trueno River Hydroelectric Power Plant - History
Project 4337: Trueno River Hydroelectric Power Plant

Data before approval of the request for post-registration changes on 18 Feb 2014

Link to PRC form PRC
CDM-PDD project design document (928 KB)


PDD appendices
Appendix 1 - 31. Annex 11 - NIR 8 INVOICE 1321 Turbinas (160 KB)
Appendix 2 - 39. ANNEX 19 - CAR 15 SERVICE AGREEMENT TRUENO _translated_ (570 KB)
Appendix 3 - 49. Annex 5 - CL8 Orden de compra turbinas Trueno WKV (1224 KB)
Appendix 4 - 54. Annex 7 RV (prior consideration of CDM Trueno PDD) (527 KB)
Appendix 5 - 56. 2005 load duration curve (871 KB)
Appendix 6 - 57. 2006 load duration curve (807 KB)
Appendix 7 - 58. 2007 load duration curve (806 KB)
Appendix 8 - 96. Acta de directorio Consideracion previa e importancia MDL Trueno (221 KB)
Appendix 9 - 122. FACTIBILIDAD TRUENO SA (28 july 2010)_public (196 KB)
Appendix 10 - 123. Chile SIC combined margin 2005-2007 (Low EFs 50-50) (401 KB)
Appendix 11 - 130. calculations for the PDD Trueno (4426 bytes)
Appendix 12 - 138. Informe Trueno v15_T_ENG (1316 KB)