17:04 23 Sep 26
Project
3516 :
3.75 MW Bundled Wind Power Project in Maharashtra
| Project title |
3.75 MW Bundled Wind Power Project in Maharashtra
- project design document (780 KB)
PDD appendices Appendix 1 - IRR Spreadsheet - Conceptulization (183 KB)
Appendix 2 - IRR Spreadsheet - Based on actual assumptions (198 KB)
Appendix 3 - CER Calculation Spreadsheet (27 KB)
- registration request form (626 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
India
, involved indirectly
approval (183 KB)
authorization (183 KB)
Authorized Participants: M/s Advik Hi-tech Pvt. Ltd. ; Aurangabad Electricals Ltd. (withdrawn) |
| Other Parties Involved | n/a |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale |
SMALL
bundling form (66 KB)
|
| Methodologies Used |
AMS-I.D. ver. 13 -
Grid connected renewable electricity generation
|
| Standardized baselines used | N/A |
| Amount of Reductions | 5,650 metric tonnes CO2 equivalent per annum |
| Fee level | USD 0.0 |
| Validation Report |
Validation report (542 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 27/11/2012 MoC Annex 2 (Withdraw Project Participant) valid as of 11/07/2011 |
| Registration Date | 27 Aug 10 (view history) |
| Crediting Period | 27 Aug 10 - 26 Aug 20 (Fixed) |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - IRR Spreadsheet - Conceptulization
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: