06:28 02 Nov 25
Project
2425 :
Addition of a power generation micro unit at the 5 de Noviembre Power Plant
| Project title |
Addition of a power generation micro unit at the 5 de Noviembre Power Plant
- project design document (570 KB)
PDD appendices Appendix 1 - Ref 7 - Additionality (148 KB)
Appendix 2 - Ref 8 - El Salvador baseline (134 KB)
- registration request form (642 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
El Salvador
, involved indirectly
approval (54 KB)
authorization (54 KB)
Authorized Participants: Comisión Ejecutiva Hidroeléctrica |
| Other Parties Involved | n/a |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | SMALL |
| Methodologies Used |
AMS-I.D. ver. 13 -
Grid connected renewable electricity generation
|
| Standardized baselines used | N/A |
| Amount of Reductions | 1,549 metric tonnes CO2 equivalent per annum |
| Fee level | USD 0.0 |
| Validation Report |
Validation report (429 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication | |
| Registration Date | Withdrawn (view history) |
| Crediting Period | 09 Apr 09 - 08 Apr 15 (Renewable) |

project design document
Appendix 1 - Ref 7 - Additionality
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: