Project 2425 : Addition of a power generation micro unit at the 5 de Noviembre Power Plant
Project title Addition of a power generation micro unit at the 5 de Noviembre Power Plant
- project design document (570 KB)

PDD appendices
Appendix 1 - Ref 7 - Additionality (148 KB)
Appendix 2 - Ref 8 - El Salvador baseline (134 KB)


- registration request form (642 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties El Salvador , involved indirectly approval (54 KB) authorization (54 KB)
Authorized Participants: Comisión Ejecutiva Hidroeléctrica
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale SMALL
Methodologies Used AMS-I.D. ver. 13 - Grid connected renewable electricity generation
Standardized baselines used N/A
Amount of Reductions 1,549 metric tonnes CO2 equivalent per annum
Fee level USD 0.0
Validation Report Validation report (429 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
Registration Date Withdrawn   (view history)  
Crediting Period 09 Apr 09 - 08 Apr 15 (Renewable)