Project: 2404 Leak Reduction in Above Ground Gas Distribution Equipment in the KazTransgaz-Tbilisi Gas Distribution System- Tbilisi, Georgia - Issuance Request
Project 2404: Leak Reduction in Above Ground Gas Distribution Equipment in the KazTransgaz-Tbilisi Gas Distribution System- Tbilisi, Georgia
 
ISSUANCE STATUS Issued (on 19 Dec 12)   completeness check: complete | info & rep check: concluded
Monitoring period 01 Apr 11 - 31 Mar 12
Monitoring report Monitoring report (1341 KB)
 
Request for issuance Signed form (405 KB)
Amount of CERs CERs issued up to 31 December 2012: 171,245
Serial Range: Block start: GE-5-247284-1-1-0-2404     Block end: GE-5-418528-1-1-0-2404
Verification and certification reports VVS/VVM version: VVS 2.0
Certification report (44 KB)
Verification report (1505 KB)
Additional documents CER Calculation_Kaztransgaz-Tbilisi (1222 KB)
Monitoring Report_Kaztransgaz-Tbilisi (637 KB)