16:19 02 Dec 25
Project
2393 :
Angelina Small Hydro Power Plant Project – A Brascan Energética S/A Project Activity.
| Project title |
Angelina Small Hydro Power Plant Project – A Brascan Energética S/A Project Activity.
- project design document (541 KB)
PDD appendices Appendix 1 - WACC Calculation (940 KB)
Appendix 2 - WACC Cashflow. (581 KB)
Appendix 3 - Grid Emission Factors (5901 KB)
Appendix 4 - CDM Consideration (54 KB)
Appendix 5 - CER Spreadsheet (61 KB)
- registration request form (650 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
Brazil
, involved indirectly
approval (115 KB)
authorization (115 KB)
Authorized Participants: Lumbrás Energética S.A. ; Ecoinv Global Ltda. |
| Other Parties Involved | n/a |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | LARGE |
| Methodologies Used |
ACM0002 ver. 7 -
Consolidated methodology for grid-connected electricity generation from renewable sources
|
| Standardized baselines used | N/A |
| Amount of Reductions | 40,807 metric tonnes CO2 equivalent per annum |
| Fee level | USD 6661.4 |
| Validation Report |
Validation report (421 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication | |
| Registration Date | Withdrawn (view history) |
| Crediting Period | 01 Jul 09 - 30 Jun 16 (Renewable) |

project design document
Appendix 1 - WACC Calculation
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: