Project: 1951 ANAEROBIC DIGESTION SWINE WASTEWATER TREATMENT WITH ON-SITE POWER PROJECT (ADSW RP2001) - History
Project 1951: ANAEROBIC DIGESTION SWINE WASTEWATER TREATMENT WITH ON-SITE POWER PROJECT (ADSW RP2001)
Request for review Request 1
Request 2
Request 3


EB meeting: EB44
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
DOE Initial comments (53 KB)
Annex 1 - Revised PDD (578 KB)
Annex 2 - Revised Validation Report (309 KB)
PP Initial comments (68 KB)
Annex I Question 1 ADSWRP2001 development timeline-new (51 KB)
Attachment 1 HBC SEC cert of incorporation (292 KB)
Attachment 1b HBC-CEAL subscription (690 KB)
Attachment 2 ACME DNA application (576 KB)
Attachment 3 Status Report-Gannt Charts 0529 (16 KB)
Attachment 4 ACME PSA with annex2 (1153 KB)
Attachment 5 HBC inward remittance from CEAL_marked (685 KB)
Review Scope (97 KB)

EB meeting: EB45
(at which the report of the review team was/will be considered)

Data before corrections

Amount of Reductions 2,460 metric tonnes CO2 equivalent per annum
CDM-PDD project design document (445 KB)


PDD appendices
Appendix 1 - CDM Consideration (2226 KB)
Appendix 2 - EF Calculations (105 KB)
Validation Report Validation report (338 KB)