10:31 22 Dec 25
Project:
1402 BBMG Cement WHR for 10.5 MW power generation project in Beijing
- History
| Project | 1402: BBMG Cement WHR for 10.5 MW power generation project in Beijing |
|---|
Data before acceptance of changes in PDD on 16 Dec 2011
| CDM-PDD |
project design document (697 KB)
PDD appendices Appendix 1 - CER/IRR Spreadsheet (166 KB)
Appendix 2 - CER/IRR Spreadsheet (266 KB)
Appendix 3 - CDM Credit Consideration (1643 KB)
Appendix 4 - Proof of Benchmark (277 KB)
|
|---|

project design document
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: