Issuance Request for Review Form
CDM project activity/programme of activities issuance request review form (CDM-ISSR-FORM) (Version 03.0) |
---|
Project title of the project activity or programme of activities (PoA) for which issuance is requested | Project for the catalytic reduction of N2O emissions with a secondary catalyst inside the ammonia reactor of the N1 & N2 nitric acid plants at Haifa Chemicals Ltd., Israel (1369) |
---|---|
DOE that requested for issuance and date of request | DNV (17 Jul 09) |
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review | |
Incompetence | |
Please indicate reasons for the request for review | |
The DOE is requested to clarify how it verified the calculation of baseline campaign length (21,035 tHNO3) considering that the nitric acid production during baseline campaign (NAPBC) is 22,178 tHNO3 and baseline emission factor and adjustment of N2O values measured beyond the normal campaign length (CLnormal: 21,043 tHNO3) during the baseline campaign for plant N1. OTHER ISSUES The PP is requested to provide the consistent data for normal operating temperature in the monitoring report (Page 21: N1 - 828.91~873.57, N2 - 864.79~883. 71 / Page 8 of Annex 1: N1 - 829.08~ 873.78, N2 - 864.86~883.69). |
|
Date | 26 Sep 09 |