22:00 13 Nov 25
Project:
1320 Beijing Taiyanggong CCGT Trigeneration Project
- Crediting Period Renewal Request
[]
| Project |
1320: Beijing Taiyanggong CCGT Trigeneration Project
- project design document (963 KB)
PDD appendices Appendix 1 - ER sheet 2nd CP_Beijing Taiyanggong CCGT. (122 KB)
- crediting period renewal form (549 KB)
|
|---|---|
| Methodologies Used |
AM0029 ver. 3 -
Baseline Methodology for Grid Connected Electricity Generation Plants using Natural Gas
|
| VVS Version | |
| Standardized baselines used | N/A |
| Amount of Reductions | 551,468 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (1143 KB)
|
| Renewal Date |
28 Nov 14
(Renewable - Expired)
(view history)
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
24 Feb 15 - 23 Feb 22
Other crediting period(s): 24 Feb 08 - 23 Feb 15 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER sheet 2nd CP_Beijing Taiyanggong CCGT.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: