19:52 28 Oct 25
Project
1068 :
ENERGY EFFICIENCY MEASURES AT CEMENT PRODUCTION PLANT
| Project title |
ENERGY EFFICIENCY MEASURES AT CEMENT PRODUCTION PLANT
- project design document (427 KB)
PDD appendices Appendix 1 - Board Note (247 KB)
Appendix 2 - CER calculations (609 KB)
Appendix 3 - Enclosure 3B (101 KB)
Appendix 4 - Enclosure 3A (124 KB)
- registration request form (86 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
India
, involved indirectly
approval (69 KB)
authorization (69 KB)
Authorized Participants: Birla Corporation Limited; Unit: Chittorgarh |
| Other Parties Involved | n/a |
| Sectoral scopes |
3 : Energy demand
4 : Manufacturing industries |
| Activity Scale | SMALL |
| Methodologies Used |
AMS-II.D. ver. 8 -
Energy efficiency and fuel switching measures for industrial facilities
|
| Standardized baselines used | N/A |
| Amount of Reductions | 4,378 metric tonnes CO2 equivalent per annum |
| Fee level | USD 0.0 |
| Validation Report |
Validation report (645 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication | |
| Registration Date | Rejected (view history) |
| Crediting Period | 01 Apr 00 - 31 Mar 10 (Fixed) |

project design document
Appendix 2 - CER calculations
Appendix 3 - Enclosure 3B
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: