Issuance Request for Review Form


CDM project activity/programme of activities
issuance request review form (CDM-ISSR-FORM)
(Version 03.0)

Project title of the project activity or programme of activities (PoA) for which issuance is requestedFuel switch from fossil fuel to renewable biomass for thermal energy applications in Rajasthan (0949)
DOE that requested for issuance and date of requestSGS (11 Jul 08)
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review
Incompetence
Please indicate reasons for the request for review
The DOE is requested to clarify how it has verified that:
1. The entire quantity of biomass measured by the weigh bridge installed at the main entry of manufacturing plant was consumed in the project boiler only.
2. The same quantity of energy input in the boiler is required in the baseline as in the project, for calculations of equivalent coal replaced without taking into account the efficiency of boiler in different scenarios.
Date 12 Aug 08