Issuance Request for Review Form


CDM project activity/programme of activities
issuance request review form (CDM-ISSR-FORM)
(Version 03.0)

Project title of the project activity or programme of activities (PoA) for which issuance is requestedHuaycoloro landfill gas capture and combustion (0708)
DOE that requested for issuance and date of requestTÜV SÜD (09 Oct 09)
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review
Incompetence
Please indicate reasons for the request for review
1. The PP/DOE stated that the power generation component was not installed because the financial analysis does not make the project economically feasible. Clarifications are required on whether this is a permanent change from the PDD and which is the expected date to install the power house.

OTHER ISSUES:
2. According with the monitoring plan, P and T from the LFG should have been measured to calculate the methane density. However, the Monitoring Report stated that these variables were not monitored and stated that “as established by the manufacturer, the mass flow meter registers the normalized volume at 21.1°C and 1.013 bar” (page 7). The DOE is required to clarify whether values of P and T were monitored, as the Verification Report states in page 8 that “LFG flow, temperature and pressure measurements are collected electronically”, and in page 9 that “Data of LFG flow is taken by a flow meter and also temperature and pressure are taken to convert the LFG flow into Normalized flow.”
Date 15 Jan 10