Project 9784 : SHPs Coronel Araújo and Passo Ferraz CDM Project (JUN1059), Brazil
Project title SHPs Coronel Araújo and Passo Ferraz CDM Project (JUN1059), Brazil
- project design document (482 KB)

PDD appendices
Appendix 1 - 9784 CDM Consideration_CAR (440 KB)
Appendix 2 - 9784 CDM Consideration_PFZ (353 KB)
Appendix 3 - 9784 IRR Calculation_CAR (518 KB)
Appendix 4 - 9784 IRR Calculation_PFZ (516 KB)
Appendix 5 - 9784 WACC (85 KB)
Appendix 6 - 9784 CER Calculation (63 KB)


- registration request form (787 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties Brazil , involved indirectly approval (221 KB) authorization (221 KB)
Authorized Participants: Coronel Araújo Energética S/A ; Passo Ferraz Energia S/A ; Carbotrader Assessoria e Consultoria em Energia Eireli
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale SMALL
bundling form (77 KB)
Methodologies Used AMS-I.D. ver. 17 - Grid connected renewable electricity generation
Standardized baselines used N/A
Amount of Reductions 10,431 metric tonnes CO2 equivalent per annum
Fee level USD 0.0
Validation Report VVS/VVM version: VVS 3.0
Validation report (1792 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
Registration Date Rejected   (view history)   completeness check: complete info & rep check: concluded
Crediting Period 01 Jan 14 - 31 Dec 20 (Renewable)