Project 9573 : 19.5 MW wind power project in Ossiya, Rajasthan by Gujarat Fluorochemicals Limited (GFL)
Project title 19.5 MW wind power project in Ossiya, Rajasthan by Gujarat Fluorochemicals Limited (GFL)
- project design document (960 KB)

PDD appendices
Appendix 1 - 9573 CDM Consideration (534 KB)
Appendix 2 - 9573 IRR Calculation (136 KB)
Appendix 3 - 9573 Benchmark (11 KB)
Appendix 4 - 9573 Common Practice (54 KB)
Appendix 5 - 9573 CER Calculation (790 KB)


- registration request form (689 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties India , involved indirectly approval (601 KB) authorization (601 KB)
Authorized Participants: M/s Gujarat Fluorochemicals Limited (withdrawn) ; M/s Inox Renewables Limited
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodologies Used ACM0002 ver. 13 - Consolidated baseline methodology for grid-connected electricity generation from renewable sources
Standardized baselines used N/A
Amount of Reductions 33,455 metric tonnes CO2 equivalent per annum
Fee level USD 5191.0
Validation Report VVS/VVM version: VVM 1.2
Validation report (1395 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 13/06/2014
MoC Annex 2 (Withdraw Project Participant) valid as of 12/06/2014
MoC Annex 2 (Add Project Participant) valid as of 12/06/2014
Registration Date 08 Feb 13 (Date of registration action 04 Oct 13)   (view history)   completeness check: complete info & rep check: concluded
Crediting Period 01 Apr 13 - 31 Mar 20 (Renewable - Expired)
Renewal no longer possible
Requests for Issuance
and related documentation