23:35 11 Nov 26
Project
9312 :
Natural gas based electricity generation project at Plaza Indonesia
| Project title |
Natural gas based electricity generation project at Plaza Indonesia
- project design document (1201 KB)
PDD appendices Appendix 1 - 9312 Ecoinvest Withdrawal Declaration (28 KB)
Appendix 2 - 9312 GEF Calculation (10 MB)
Appendix 3 - 9312 NPV & CER Calculations (114 KB)
Appendix 4 - 9312 CDM Consideration (400 KB)
- registration request form (805 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
Indonesia
, involved indirectly
approval (1068 KB)
authorization (1068 KB)
Authorized Participants: PT Plaza Indonesia Realty Tbk |
| Other Parties Involved | n/a |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | SMALL |
| Methodologies Used |
AMS-III.AG. ver. 2 -
Switching from high carbon intensive grid electricity to low carbon intensive fossil fuel
|
| Standardized baselines used | N/A |
| Amount of Reductions | 19,192 metric tonnes CO2 equivalent per annum |
| Fee level | USD 2338.4 |
| Validation Report |
VVS/VVM version:
VVM 1.2
Validation report (1760 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 16/09/2013 |
| Registration Date | 28 Dec 12 (Date of registration action 08 Jul 13) (view history) completeness check: complete info & rep check: concluded |
| Crediting Period | 28 Dec 12 - 27 Dec 22 (Fixed) |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 2 - 9312 GEF Calculation
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: