Registration Request for Review Form
CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 7777 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Efe'e Landfill Gas to renewable electricity Project |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1) During the consideration of baseline alternatives, scenarios LFG3, LFG4 and LFG5 were excluded based on observations and interviews during the on-site visit and based on public information about the landfill. However, it is unclear how the exclusions are in line with the prevailing waste management practices in the region attended by the landfill as well as relevant national and/or sectoral circumstances. The DOE is requested to further substantiate how it has validated that the LFG would not be partially generated because the organic fraction of the waste received by the landfill would be either (i) recycled, (ii) treated aerobically, (iii) incinerated in the absence of the project. Please refer to VVS version 2.0 – paragraphs 93 and 94. 2) The DOE is required to substantiate how it has validated that the project complies with the applicability criteria "d) Do not reduce the amount of organic waste that would be recycled in the absence of the project activity" as it was justified only based on the waste received by the landfill, without assessing the prevailing waste management practices in the region attended by the landfill as well as relevant national and/or sectoral circumstances and whether the amount of waste recycled is maintained after the project implementation. Please refer to VVS version 2.0 - paragraph 74. 3) The DOE has validated, in page 85 of the validation report, that the parameter FCH4,BL,y (amount of methane in the LFG that would be flared in the baseline in year y) is equal to zero as the collection and treatment of LFG is not mandatory in Israel. However, it should have also validated how the requirements included in the landfill operator's permit (which states that landfill gas should be treated if the methane concentrations in the landfill surface site exceed 4.75%, or if methane concentrations exceed 1.25% in the operational buildings on the landfill site, as indicated at page 16 from the PDD), impact this parameter. Please refer to VVS version 2.0 - paragraph 98. 4) The DOE is required to explain how it has validated the default value of flare efficiency applied by the project based on the height of the flare installed (as per the tool’s definition of low height flare). Please refer to VVS version 2.0 - paragraph 98. 5) The monitoring of the parameter "Management of SWDS" shall be included in the monitoring plan and validated by the DOE. Please refer to VVS version 2.0 - paragraph 132 (a). |
|
Date | 16 Apr 13 |