20:53 17 Sep 26
Project
7330 :
Avoid methane emission through aerobic composting at Tan Thanh solid waste treatment plant
| Project title |
Avoid methane emission through aerobic composting at Tan Thanh solid waste treatment plant
- project design document (1958 KB)
PDD appendices Appendix 1 - 7330 PP Name Change (204 KB)
Appendix 2 - 7330 IRR Calculation (44 KB)
Appendix 3 - 7330 EF Calculation (499 KB)
Appendix 4 - 7330 CER Calculation (434 KB)
- registration request form (763 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
Viet Nam
, involved indirectly
approval (682 KB)
authorization (682 KB)
Authorized Participants: Bao Ngoc Green Environment Joint Stock Company ; Energy and Environment Consultancy Joint Stock Company |
| Other Parties Involved |
Switzerland
, involved indirectly
approval (290 KB)
authorization (290 KB)
Authorized Participants: South Pole Carbon Asset Management Ltd. |
| Sectoral scopes |
1 : Energy industries (renewable - / non-renewable sources)
13 : Waste handling and disposal |
| Activity Scale | LARGE |
| Methodologies Used |
AM0025 ver. 13 -
Avoided emissions from organic waste through alternative waste treatment processes
|
| Standardized baselines used | N/A |
| Amount of Reductions | 31,220 metric tonnes CO2 equivalent per annum |
| Fee level | USD 4744.0 |
| Validation Report |
VVS/VVM version:
VVM 1.2
Validation report (1477 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 26/08/2013 |
| Registration Date | 29 Nov 12 (Date of registration action 18 Feb 13) (view history) completeness check: complete info & rep check: concluded |
| Crediting Period | 01 Jun 13 - 31 May 23 (Fixed) |
|
Status of a registered
project activity report |
The project activity or PoA is under implementation, but has not reached the stage of monitoring GHG emission reductions or removal enhancements |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 2 - 7330 IRR Calculation
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: