20:09 14 Sep 26
Project
7179 :
3.70 MW Grid Connected Wind Power Project in Madhya Pradesh
| Project title |
3.70 MW Grid Connected Wind Power Project in Madhya Pradesh
- project design document (540 KB)
PDD appendices Appendix 1 - 7179 IRR Calculation Agarwal Flour (59 KB)
Appendix 2 - 7179 IRR Calculation Betul Oil (62 KB)
Appendix 3 - 7179 IRR Calculation Mittal Appliances (57 KB)
Appendix 4 - 7179 IRR Calculation Vippy (58 KB)
Appendix 5 - 7179 WACC Calculations (13 KB)
Appendix 6 - 7179 CER Calculation (10 KB)
Appendix 7 - 7179 Generation Data (19 KB)
Appendix 8 - 7179 Comments to Incomplete (458 KB)
- registration request form (870 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
India
, involved indirectly
approval (119 KB)
authorization (119 KB)
Authorized Participants: M/s Agarwal Flour Mills ; M/s Betul Oils & Flours Limited ; M/s Mittal Appliances Limited ; M/s Vippy Spinpro Limited |
| Other Parties Involved | n/a |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale |
SMALL
bundling form (420 KB)
|
| Methodologies Used |
AMS-I.D. ver. 17 -
Grid connected renewable electricity generation
|
| Standardized baselines used | N/A |
| Amount of Reductions | 6,500 metric tonnes CO2 equivalent per annum |
| Fee level | USD 0.0 |
| Validation Report |
VVS/VVM version:
VVM 1.2
Validation report (2123 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 01/07/2013 |
| Registration Date | 21 Dec 12 (Date of registration action 28 Feb 13) (view history) completeness check: complete info & rep check: concluded |
| Crediting Period | 21 Dec 12 - 20 Dec 22 (Fixed) |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - 7179 IRR Calculation Agarwal Flour
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: