Project 7094 : Run of River Hydroelectric Project on Alaknanda River in Uttarakhand
Project title Run of River Hydroelectric Project on Alaknanda River in Uttarakhand
- project design document (1020 KB)

PDD appendices
Appendix 1 - 7094 IRR Calculation (553 KB)
Appendix 2 - 7094 CEA Database Common Practice (621 KB)


- registration request form (817 KB)
SDC description report SD-tool Report

Report(s):
SD-tool_7094_20180411.pdf (100 KB)

Host Parties India , involved indirectly approval (243 KB) authorization (243 KB)
Authorized Participants: M/s GMR (Badrinath) Hydro Power Generation Private Limited (GBHPL)
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodologies Used ACM0002 ver. 13 - Consolidated baseline methodology for grid-connected electricity generation from renewable sources
Standardized baselines used N/A
Amount of Reductions 951,395 metric tonnes CO2 equivalent per annum
Fee level USD 188779.0
Validation Report VVS/VVM version: VVM 1.2
Validation report (1300 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 25/06/2013
Registration Date 14 Dec 12 (Date of registration action 25 Feb 13)   (view history)   completeness check: complete info & rep check: concluded
Crediting Period 01 Jan 19 - 31 Dec 25 (Renewable)
Status of a registered
project activity report
The project activity or PoA is under implementation, but has not reached the stage of monitoring GHG emission reductions or removal enhancements
Requests for Issuance
and related documentation