Project 6567 : Fuel Switch at Corobrik’s Driefontein Brick Factory in South Africa
Project title Fuel Switch at Corobrik’s Driefontein Brick Factory in South Africa
- project design document (850 KB)

PDD appendices
Appendix 1 - 6567 CDM Consideration (373 KB)
Appendix 2 - 6567 Investment Analysis (65 KB)
Appendix 3 - 6567 CER Calculation (98 KB)
Appendix 4 - 6567 Comments to Incomplete (153 KB)


- registration request form (681 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties South Africa , involved indirectly approval (422 KB) authorization (422 KB)
Authorized Participants: Corobrik (Pty) Ltd
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale SMALL
Methodologies Used AMS-III.B. ver. 15 - Switching fossil fuels
Standardized baselines used N/A
Amount of Reductions 37,131 metric tonnes CO2 equivalent per annum
Fee level USD 5926.2
Validation Report VVS/VVM version: VVM 1.2
Validation report (1467 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
Registration Date Rejected   (view history)   completeness check: complete info & rep check: concluded
Crediting Period 15 Jul 12 - 14 Jul 19 (Renewable)