07:29 24 Oct 25
Project
6567 :
Fuel Switch at Corobrik’s Driefontein Brick Factory in South Africa
| Project title |
Fuel Switch at Corobrik’s Driefontein Brick Factory in South Africa
- project design document (850 KB)
PDD appendices Appendix 1 - 6567 CDM Consideration (373 KB)
Appendix 2 - 6567 Investment Analysis (65 KB)
Appendix 3 - 6567 CER Calculation (98 KB)
Appendix 4 - 6567 Comments to Incomplete (153 KB)
- registration request form (681 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
South Africa
, involved indirectly
approval (422 KB)
authorization (422 KB)
Authorized Participants: Corobrik (Pty) Ltd |
| Other Parties Involved | n/a |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | SMALL |
| Methodologies Used |
AMS-III.B. ver. 15 -
Switching fossil fuels
|
| Standardized baselines used | N/A |
| Amount of Reductions | 37,131 metric tonnes CO2 equivalent per annum |
| Fee level | USD 5926.2 |
| Validation Report |
VVS/VVM version:
VVM 1.2
Validation report (1467 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication | |
| Registration Date | Rejected (view history) completeness check: complete info & rep check: concluded |
| Crediting Period | 15 Jul 12 - 14 Jul 19 (Renewable) |

project design document
Appendix 2 - 6567 Investment Analysis
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: