11:23 21 Nov 24
Project
6567 :
Fuel Switch at Corobrik’s Driefontein Brick Factory in South Africa
Project title |
Fuel Switch at Corobrik’s Driefontein Brick Factory in South Africa
- project design document (850 KB) PDD appendices Appendix 1 - 6567 CDM Consideration (373 KB) Appendix 2 - 6567 Investment Analysis (65 KB) Appendix 3 - 6567 CER Calculation (98 KB) Appendix 4 - 6567 Comments to Incomplete (153 KB) - registration request form (681 KB) |
---|---|
SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
Host Parties |
South Africa
, involved indirectly
approval (422 KB)
authorization (422 KB)
Authorized Participants: Corobrik (Pty) Ltd |
Other Parties Involved | n/a |
Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
Activity Scale | SMALL |
Methodologies Used |
AMS-III.B. ver. 15 -
Switching fossil fuels
|
Standardized baselines used | N/A |
Amount of Reductions | 37,131 metric tonnes CO2 equivalent per annum |
Fee level | USD 5926.2 |
Validation Report |
VVS/VVM version:
VVM 1.2
Validation report (1467 KB) Public availability information Link to information uploaded for public availability |
Modalities of Communication | |
Registration Date | Rejected (view history) completeness check: complete info & rep check: concluded |
Crediting Period | 15 Jul 12 - 14 Jul 19 (Renewable) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: