13:19 12 Nov 26
Project
6213 :
Leak Reduction in Above Ground Gas Distribution Equipment in ‘Socar Georgia Gas’ gas distribution system, Georgia
| Project title |
Leak Reduction in Above Ground Gas Distribution Equipment in ‘Socar Georgia Gas’ gas distribution system, Georgia
- project design document (997 KB)
PDD appendices Appendix 1 - 6213 Simple Cost Calculation (10 KB)
Appendix 2 - 6213 CER Calculation (26 KB)
- registration request form (749 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
Georgia
, involved indirectly
approval (1472 KB)
authorization (1472 KB)
Authorized Participants: Ltd. "Socar Georgia Gas" |
| Other Parties Involved |
Switzerland
, involved indirectly
approval (373 KB)
authorization (373 KB)
Authorized Participants: Arcadia Energy (Suisse) S.A. ; Q.C.A. AG |
| Sectoral scopes | 10 : Fugitive emissions from fuels (solid, oil and gas) |
| Activity Scale | LARGE |
| Methodologies Used |
AM0023 ver. 4 -
Leak detection and repair in gas production, processing, transmission, storage and distribution systems and in refinery facilities
|
| Standardized baselines used | N/A |
| Amount of Reductions | 173,651 metric tonnes CO2 equivalent per annum |
| Fee level | USD 33230.2 (deferred) |
| Validation Report |
VVS/VVM version:
VVM 1.2
Validation report (1274 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 26/02/2013 |
| Registration Date | 10 Oct 12 (Date of registration action 02 Jan 13) (view history) completeness check: complete info & rep check: concluded |
| Crediting Period | 01 Nov 12 - 31 Oct 22 (Fixed) |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - 6213 Simple Cost Calculation
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: