12:35 12 Jul 26
Project:
5534 Chongqing Wuxi Yushan 4.8MW Hydro Power Project
- History
| Project | 5534: Chongqing Wuxi Yushan 4.8MW Hydro Power Project |
|---|
Data before approval of the request for post-registration changes on 28 Mar 2013
| Link to PRC form | PRC |
|---|---|
| CDM-PDD |
project design document (960 KB)
PDD appendices Appendix 1 - 5534 CDM Consideration (29 KB)
Appendix 2 - 5534 CER Calculation (71 KB)
|

project design document
Appendix 2 - 5534 CER Calculation
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: