CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 5501 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Anhui Zhongguangyuan Cement 9MW Waste Heat Recovery Project |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1) The DOE shall justify whether the equations and parameters in the PDD have been correctly applied in particular, whether the determination of QOE,y is in accordance with AMS III Q v3 and ACM0012 v3.2 given that QOE,y has been considered equal to EGy whereas QOE,y should be the actual electricity generation of the power plant and EGy is the electricity supplied to the recipient plant as per the applied methodology. Please refer to ACM0012 v3.2, page 13 & 27 and VVM 1.2, paragraph 90.. 2) The DOE shall further justify the suitability of the input values to BE calculation, in particular, suitability of the assumed QOE,BL of 61,600MWh (the best available technical assessment data from FSR conducted by Sinoma International Engineering Co., Ltd.) given that the maximum recoverable energy from WECM of the project activity is 76,281MWh (page 34 of PDD). In doing so, the DOE shall also justify how the project activity meets the applicability criteria of paragraph 5 of the methodology. Please refer to ACM0012 v3.2, paragraph Method-3 of Capping of Baseline Emissions and AMS III.Q v.3, paragraph 5.. |
|
Date | 17 Mar 12 |