Project 4919 : Ningxia Hongsipu 50MWp PV (photovoltaic) Power No.1 Plant Project
Project title Ningxia Hongsipu 50MWp PV (photovoltaic) Power No.1 Plant Project
- project design document (1161 KB)

PDD appendices
Appendix 1 - 4919 IRR Calculation (121 KB)
Appendix 2 - 4919 ER&EF Calculation (72 KB)
Appendix 3 - 4919 CDM Consideration (768 KB)


- registration request form (1401 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties China , involved indirectly approval (451 KB) authorization (451 KB)
Authorized Participants: Ningxia Electric Power Group Co., Ltd.
Other Parties Involved United Kingdom of Great Britain and Northern Ireland , involved indirectly approval (82 KB) authorization (82 KB)
Authorized Participants: Noble Carbon Credits Limited (withdrawn)
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodologies Used ACM0002 ver. 12 - Consolidated baseline methodology for grid-connected electricity generation from renewable sources
Standardized baselines used N/A
Amount of Reductions 92,973 metric tonnes CO2 equivalent per annum
Fee level USD 17094.6
Validation Report Validation report (1577 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 17/04/2013
MoC Annex 2 (Withdraw Project Participant) valid as of 16/04/2013
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 22/03/2013
Registration Date 24 Jun 11 (Date of registration action 16 Sep 11)   (view history)   completeness check: complete info & rep check: concluded
Crediting Period 01 Sep 11 - 31 Aug 18 (Renewable - Expired)
Renewal no longer possible
Requests for Issuance
and related documentation