12:12 11 Nov 26
Project
4207 :
Tailan River the 4th Hydropower Station Project in Wensu County, Aksu Area, Xinjiang Autonomous Region
| Project title |
Tailan River the 4th Hydropower Station Project in Wensu County, Aksu Area, Xinjiang Autonomous Region
- project design document (456 KB)
PDD appendices Appendix 1 - Tailan CDM Consideration (406 KB)
Appendix 2 - Tailan IRR Calculation (100 KB)
Appendix 3 - Tailan Emission Reductions Calculation (89 KB)
- registration request form (2131 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
China
, involved indirectly
approval (639 KB)
authorization (639 KB)
Authorized Participants: Xinjiang Tianshanyuan Energy Development Co., Ltd. |
| Other Parties Involved |
Sweden
, involved indirectly
approval (421 KB)
authorization (421 KB)
Authorized Participants: Carbon Asset Management Sweden Pte Ltd |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | SMALL |
| Methodologies Used |
AMS-I.D. ver. 15 -
Grid connected renewable electricity generation
|
| Standardized baselines used | N/A |
| Amount of Reductions | 32,167 metric tonnes CO2 equivalent per annum |
| Fee level | USD 4933.4 |
| Validation Report |
Validation report (648 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 02/07/2012 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 21/07/2011 |
| Registration Date | 19 Feb 11 (view history) |
| Crediting Period |
01 Apr 11 - 31 Mar 18
(Renewable - Expired)
Renewal no longer possible
|
| Requests for Issuance
and related documentation |
|

project design document
Appendix 2 - Tailan IRR Calculation
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: