20:14 16 Nov 25
Project:
4114 Henan Yinge Industrial Investment Corporation Wastewater Treatment and Methane Recovery Project
- History
| Project | 4114: Henan Yinge Industrial Investment Corporation Wastewater Treatment and Methane Recovery Project |
|---|
Data before approval of the request for post-registration changes on 24 May 2013
| Link to PRC form | PRC |
|---|---|
| CDM-PDD |
project design document (619 KB)
PDD appendices Appendix 1 - Yinge Financial Analysis 2.86 MW (124 KB)
Appendix 2 - Yinge Financial Analysis 3 MW (123 KB)
Appendix 3 - Yinge Emission Reductions Calculation (147 KB)
Appendix 4 - Yinge Prior CDM Consideration Form to DNA (532 KB)
|

project design document
Appendix 1 - Yinge Financial Analysis 2.86 MW
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: