Project 3457 : Chieng Cong Hydropower Project
Project title Chieng Cong Hydropower Project
- project design document (1197 KB) (accepted - 18 Jan 2012 - - view previous)

PDD appendices
Appendix 1 - Annex 1 Design book of turbines and generators of Chieng Cong (1999 KB)
Appendix 2 - Annex 2 Providing information and reason for changing on equipment parameters from Thai Hao (1520 KB)
Appendix 3 - Annex 3 Change of power meter location (267 KB)
Appendix 4 - Annex 4 Technical explanation for metering system (594 KB)
Appendix 5 - Annex 5 Measuring electricity generation installing location of circuit breaker (330 KB)
Appendix 6 - Annex 6-1 Including the detail power meter cost in total investment cost in the planning period (223.435) (229 KB)
Appendix 7 - Annex 6-2 Including the detail power meter cost in total investment cost in the planning period (223.16) (591 KB)
Appendix 8 - Annex 7 Signing equipment contract for power meters (1194 KB)
Appendix 9 - Annex 8 Revised Chieng Cong financial analysis_tracks (205 KB)
Appendix 10 - Annex 9 Equipments purchase agreement (turbines and generators) (3371 KB)
Appendix 11 - Annex 10 Equipment installation date under equipment contract (260 KB)
Appendix 12 - Annex 11 200704_Detail construction and equipment costs of CC1 and CC2 in the original plan (449 KB)
Appendix 13 - 20110808_ Revised PDD_Chieng Cong_track change (884 KB)
Appendix 14 - 20111124_ Revised Monitoring Plan_trackchanges (172 KB)


- revised monitoring plan (173 KB) (Approved: 06 Jan 12)
- validation report of revised monitoring plan (177 KB)
Annex 1 Change of power meter location (258 KB)
Annex 2 Technical explanation for metering system (690 KB)
Annex 3 Measuring electricity generation installing location of circuit breaker (321 KB)
List of documents submitted for the Revision of Monitoring Plan (65 KB)

- registration request form (457 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties Viet Nam , involved indirectly approval (205 KB) authorization (205 KB)
Authorized Participants: Lam Son Trading and Construction Joint Stock Company ; Energy and Environment Consultancy Joint Stock Company
Other Parties Involved Japan , involved indirectly approval (54 KB) authorization (54 KB)
Authorized Participants: The Kansai Electric Power Co., Inc. (withdrawn)
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale SMALL
Methodologies Used AMS-I.D. ver. 13 - Grid connected renewable electricity generation
Standardized baselines used N/A
Amount of Reductions 23,707 metric tonnes CO2 equivalent per annum
Fee level USD 3241.4
Validation Report Validation report (1208 KB) Public availability information
Link to information uploaded for public availability

Validation opinion on changes in PDD (269 KB)
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 26/06/2013
MoC Annex 2 (Withdraw Project Participant) valid as of 27/08/2013
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 22/08/2011
Registration Date 20 Aug 10   (view history)  
Crediting Period 20 Aug 10 - 19 Aug 17 (Renewable - Expired)
Renewal no longer possible
Requests for Issuance
and related documentation

Monitoring report: 20 Aug 2010 - 28 Feb 2011 (357 KB)
Issuance request state: Issued
CERs requested up to 31 December 2012: 3916
Serial Range: Block start: VN-5-6743235-1-1-0-3457      Block end: VN-5-6747150-1-1-0-3457
[Full view and history]



Monitoring report: 01 Mar 2011 - 29 Feb 2012 (330 KB)
Issuance request state: Issued
CERs requested up to 31 December 2012: 19509
Serial Range: Block start: VN-5-7132150-1-1-0-3457      Block end: VN-5-7151658-1-1-0-3457
[Full view and history]



Monitoring report: 01 Mar 2012 - 30 Sep 2012 (614 KB)
Issuance request state: Issued
CERs requested up to 31 December 2012: 13935
Serial Range: Block start: VN-5-8011911-1-1-0-3457      Block end: VN-5-8025845-1-1-0-3457
[Full view and history]