10:54 18 Sep 26
Project:
3435 Guangxi Baise Tianlin Dongba Hydropower Station
- Crediting Period Renewal Request
[]
| Project |
3435: Guangxi Baise Tianlin Dongba Hydropower Station
- project design document (1475 KB)
PDD appendices Appendix 1 - EF Guangxi Baise Tianlin Dongba Hydropower Station- renew (3435) (32 KB)
Appendix 2 - ER Guangxi Baise Tianlin Dongba Hydropower Station - renew(3435) (33 KB)
- crediting period renewal form (117 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 17 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS 9.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 109,408 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (704 KB)
|
| Renewal Date |
07 Oct 17
(Renewable - Expired)
(view history)
completeness check: complete
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
26 Sep 17 - 25 Sep 24
Other crediting period(s): 26 Sep 10 - 25 Sep 17 |
| Requests for Issuance
and related documentation |
Monitoring report: 26 Sep 2017 - 31 Dec 2020 (354 KB)Issuance request state: Issued CERs requested from 01 Jan 2013 until 31 December 2020: 433342 Serial Range: Block start: CN-5-1182754251-2-2-0-3435 Block end: CN-5-1183187592-2-2-0-3435 [Full view and history] |

project design document
Appendix 1 - EF Guangxi Baise Tianlin Dongba Hydropower Station- renew (3435)
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: