16:37 08 Nov 25
Project
3418 :
Methane Recovery and Power Generation Project in High-concentrated Organic Wastewater Treatment in Hubei, China
| Project title |
Methane Recovery and Power Generation Project in High-concentrated Organic Wastewater Treatment in Hubei, China
- project design document (1155 KB)
PDD appendices Appendix 1 - Huangshi Emission Reductions Calculation (82 KB)
- registration request form (487 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
China
, involved indirectly
approval (1339 KB)
authorization (1339 KB)
Authorized Participants: Huangshi Xinghua Biochemical Ltd. |
| Other Parties Involved |
United Kingdom of Great Britain and Northern Ireland
, involved indirectly
approval (181 KB)
authorization (181 KB)
Authorized Participants: Climate Bridge Ltd. ; Noble Carbon Credits Limited |
| Sectoral scopes |
1 : Energy industries (renewable - / non-renewable sources)
13 : Waste handling and disposal |
| Activity Scale | SMALL |
| Methodologies Used |
AMS-I.C. ver. 14 -
Thermal energy production with or without electricity
AMS-III.H. ver. 12 - Methane recovery in wastewater treatment |
| Standardized baselines used | N/A |
| Amount of Reductions | 45,782 metric tonnes CO2 equivalent per annum |
| Fee level | USD 7656.4 |
| Validation Report |
Validation report (568 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication | |
| Registration Date | Rejected (view history) |
| Crediting Period | 01 May 10 - 30 Apr 20 (Fixed) |

project design document
Appendix 1 - Huangshi Emission Reductions Calculation
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: