Project: 3047 Chongqing Longshui 8MW Hydro Power Project - History
Project 3047: Chongqing Longshui 8MW Hydro Power Project
Request for review Request 1
Request 2
Request 3


EB meeting: EB54
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
Response (68 KB)
IRR with actual data (134 KB)
Review Scope (131 KB)

EB meeting: EB55
(at which the report of the review team was/will be considered)

Data before corrections

CDM-PDD project design document (1153 KB)


PDD appendices
Appendix 1 - Longshui Board Resolution (37 KB)
Appendix 2 - Longshui Financials (143 KB)
Appendix 3 - Longshui Emission Reductions Calculation (57 KB)
Validation Report Validation report (559 KB)

Data before acceptance of changes in PDD on 24 Dec 2011

CDM-PDD project design document (806 KB)


PDD appendices
Appendix 1 - Longshui Board Resolution (37 KB)
Appendix 2 - Longshui Financials (143 KB)
Appendix 3 - Longshui Emission Reductions Calculation (57 KB)
Appendix 4 - Longshui Chongqing Hydro Reference tariff (159 KB)
Appendix 5 - Longshui Chongqing Hydro Reference tariff - Alternative Method (150 KB)
Appendix 6 - Longshui Chongqing Hydro Reference tariff - Alternative Method with operating hours (150 KB)
Appendix 7 - Longshui Chongqing Hydro Reference tariff with operating hours (159 KB)