Issuance Request for Review Form
CDM project activity/programme of activities issuance request review form (CDM-ISSR-FORM) (Version 03.0) |
---|
Project title of the project activity or programme of activities (PoA) for which issuance is requested | Guangzhou Zhujiang Beer Methane Recovery Project (2946) |
---|---|
DOE that requested for issuance and date of request | CEPREI (06 Sep 11) |
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review | |
Incompetence | |
Please indicate reasons for the request for review | |
1) The DOE verified installation of one gas flow meter for measuring the volume of methane captured Flowbiogas,y, which is also used for measuring methane send to engine and flare. The methodlogy AMS III.H v. 13 requires that the amount of biogas recovered, fuelled, flared or utilized (e.g., injected into a natural gas distribution grid or distributed via a dedicated piped network) shall be monitored ex post, using continuous flow meters. The DOE shall clarify how it verified that the requirements of the methodology AMS-III.H v. 13 and the registered monitoring plan regarding the separate measurement of biogas flow send to engines and to the flare has been met for the requested monitoring period. Please refer to AMS-III.H version 13, Para. 36. |
|
Date | 25 Nov 11 |