13:46 16 Dec 25
Project:
2624 Baoshan Supahe Chaoyang Hydropower Station
- Crediting Period Renewal Request
[]
| Project |
2624: Baoshan Supahe Chaoyang Hydropower Station
- project design document (2467 KB)
PDD appendices Appendix 1 - CSPG EF and Chaoyang ER calculation sheet (202 KB)
Appendix 2 - List of documents submitted_Chaoyang (35 KB)
- crediting period renewal form (35 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 17 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS 9.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 79,174 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (190 KB)
|
| Renewal Date |
19 May 17
(Renewable - Expired)
(view history)
completeness check: complete
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
09 Oct 16 - 08 Oct 23
Other crediting period(s): 09 Oct 09 - 08 Oct 16 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - CSPG EF and Chaoyang ER calculation sheet
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: