09:34 30 Oct 26
Project:
2135 Inner-Mongolia Ximeng Abag 49.5MW Wind Power Project
- Crediting Period Renewal Request
[]
| Project |
2135: Inner-Mongolia Ximeng Abag 49.5MW Wind Power Project
- project design document (1019 KB)
PDD appendices Appendix 1 - ER Calculations (104 KB)
- crediting period renewal form (163 KB) |
|---|---|
| Methodologies Used |
ACM0002 ver. 16 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS 9.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 109,410 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (352 KB)
|
| Renewal Date |
19 Feb 16
(Renewable - Expired)
(view history)
completeness check: complete
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
16 Apr 16 - 15 Apr 23
Other crediting period(s): 16 Apr 09 - 15 Apr 16 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER Calculations
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: