Project: 1831 Fujian Wuyishan Wenlin River 2nd and 3rd Level Hydropower Station - Crediting Period Renewal Request
[]
Project 1831: Fujian Wuyishan Wenlin River 2nd and 3rd Level Hydropower Station

- project design document (1031 KB)

PDD appendices
Appendix 1 - ER calculation (28 KB)

- crediting period renewal form (40 KB)
Methodologies Used AMS-I.D. ver. 18 - Grid connected renewable electricity generation
VVS Version VVS 9.0
Standardized baselines used N/A
Amount of Reductions 16,272 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (427 KB)
Renewal Date 10 Jun 16 (Renewable - Expired)   (view history)   completeness check: complete info & rep check: concluded
Renewal no longer possible
Crediting Period (requested for renewal) 11 Dec 15 - 10 Dec 22

Other crediting period(s): 11 Dec 08 - 10 Dec 15
Requests for Issuance
and related documentation