06:47 31 Dec 25
Project:
0921 4.5MW grid-connected Sugur Mini Hydel Scheme at SLS Power Industries Ltd in Bellary District, Karnataka
- History
| Project | 0921: 4.5MW grid-connected Sugur Mini Hydel Scheme at SLS Power Industries Ltd in Bellary District, Karnataka |
|---|
Data before acceptance of changes in PDD on 13 Jul 2011
| CDM-PDD |
project design document (298 KB)
PDD appendices Appendix 1 - baseline calculation (82 KB)
|
|---|

project design document
Appendix 1 - baseline calculation
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: