10:06 07 Oct 26
Project
9151 :
Xinjiang Kaidu River Xiaoshankou 3rd Cascade Hydropower Project
| Project title |
Xinjiang Kaidu River Xiaoshankou 3rd Cascade Hydropower Project
- project design document (728 KB)
PDD appendices Appendix 1 - ER worksheet of Xinjiang Kaidu River Xiaoshankou 3rd Cascade Hydropower Project (73 KB)
Appendix 2 - IRR Spreadsheet of xiaoshankou 3rd (107 KB)
- registration request form (316 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
China
, involved directly
approval (2847 KB)
authorization (2847 KB)
Authorized Participants: Xinjiang Bazhou Xinhua Hydropower Development Co., Ltd., Department of Climate Change, National Development and Reform Commission |
| Other Parties Involved | n/a |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | LARGE |
| Methodologies Used |
ACM0002 ver. 12 -
Consolidated baseline methodology for grid-connected electricity generation from renewable sources
|
| Standardized baselines used | N/A |
| Amount of Reductions | 167,920 metric tonnes CO2 equivalent per annum |
| Fee level | USD 32084.0 |
| Validation Report |
VVS/VVM version:
VVM 1.2
Validation report (1499 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 11/09/2013 |
| Registration Date | 28 Dec 12 (Date of registration action 21 Jun 13) (view history) completeness check: complete info & rep check: concluded |
| Crediting Period |
01 Sep 14 - 31 Aug 21
(Renewable - Expired)
Renewal no longer possible
|
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER worksheet of Xinjiang Kaidu River Xiaoshankou 3rd Cascade Hydropower Project
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: