22:53 13 Nov 25
Project
2341 :
Introduction of the recovery and combustion of methane in the existing sludge treatment system of the Caņaveralejo Wastewater Treatment Plant of EMCALI in Cali, Colombia
| Project title |
Introduction of the recovery and combustion of methane in the existing sludge treatment system of the Caņaveralejo Wastewater Treatment Plant of EMCALI in Cali, Colombia
- project design document (2006 KB)
(approved -
-
13 Dec 2019 -
view previous)
- registration request form (34 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
Colombia
, involved indirectly
approval (196 KB)
authorization (196 KB)
Authorized Participants: Empresas Municipales de Cali EMCALI-EICE ESP |
| Other Parties Involved |
Switzerland
, involved indirectly
approval (578 KB)
authorization (578 KB)
Authorized Participants: Post 2012 Carbon Credit Fund CV (withdrawn) ; ALLCOT AG |
| Sectoral scopes | 13 : Waste handling and disposal |
| Activity Scale | SMALL |
| Methodologies Used |
AMS-III.H. ver. 9 -
Methane recovery in wastewater treatment
|
| Standardized baselines used | N/A |
| Amount of Reductions | 56,632 metric tonnes CO2 equivalent per annum |
| Fee level | USD 9826.4 |
| Validation Report |
Validation report (649 KB)
Public availability information
Link to information uploaded for public availability Validation opinion on changes in PDD (308 KB)
|
| Modalities of Communication |
Modalities of Communication valid as of 10/11/2020 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 22/08/2022 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 19/10/2020 MoC Annex 2 (Add Project Participant) valid as of 27/03/2019 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 22/01/2019 MoC Annex 2 (Withdraw Project Participant) valid as of 27/10/2014 MoC Annex 2 (Add Project Participant) valid as of 01/07/2013 |
| Registration Date | 15 Sep 09 (view history) |
| Crediting Period |
14 Sep 10 - 13 Sep 20
(Fixed)
Changed from: 15 Sep 09 - 14 Sep 19 |
| Requests for Issuance
and related documentation |
Monitoring report: 14 Sep 2010 - 31 Oct 2012 (631 KB)Issuance request state: Issued CERs requested up to 31 December 2012: 77043 Serial Range: Block start: CO-5-15339713-1-1-0-2341 Block end: CO-5-15416755-1-1-0-2341 [Full view and history] Monitoring report: 01 Nov 2012 - 31 Dec 2013 (688 KB) (withdrawn)[Full view and history] Monitoring report: 01 Nov 2012 - 31 Dec 2014 (1394 KB) (withdrawn)[Full view and history] Monitoring report: 01 Nov 2012 - 31 Dec 2015 (1261 KB)Issuance request state: Issued CERs requested up to 31 December 2012: 4779 CERs requested from 01 Jan 2013 until 31 December 2020: 142288 Serial Range: Block start: CO-5-21259055-2-2-0-2341 Block end: CO-5-21401342-2-2-0-2341 Serial Range: Block start: CO-5-21401343-1-1-0-2341 Block end: CO-5-21406121-1-1-0-2341 [Full view and history] Monitoring report: 01 Jan 2014 - 31 Dec 2014 (997 KB) (withdrawn)[Full view and history] Monitoring report: 01 Jan 2015 - 31 Dec 2019 (1422 KB) (withdrawn)[Full view and history] Monitoring report: 01 Jan 2016 - 31 Dec 2019 (1278 KB)Issuance request state: Issued CERs requested from 01 Jan 2013 until 31 December 2020: 164240 Serial Range: Block start: CO-5-21406122-2-2-0-2341 Block end: CO-5-21570361-2-2-0-2341 [Full view and history] |

project design document
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: