Project 10197 : Small Hydro Power Plant Ernestina CEEE
Project title Small Hydro Power Plant Ernestina CEEE
- project design document (1815 KB)

PDD appendices
Appendix 1 - Ernestina_Cashflow (85 KB)
Appendix 2 - Ernestina_CER Calculation sheet (104 KB)
Appendix 3 - Ernestina_Benchmark Analysis (4644 KB)
Appendix 4 - Ernestina_Common Practice Analysis (17 MB)


- registration request form (415 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties Brazil , involved indirectly approval (49 KB) authorization (49 KB)
Authorized Participants: CEEE-GT ; LUMINA ENGENHRIA E CONSULTORIA LTDA
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodologies Used ACM0002 ver. 16 - Grid-connected electricity generation from renewable sources
Standardized baselines used N/A
Amount of Reductions 8,992 metric tonnes CO2 equivalent per annum
Fee level USD 0.0
Validation Report VVS/VVM version: VVS 9.0
Validation report (1281 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
Registration Date Rejected   (view history)   info & rep check: concluded
Crediting Period 05 Oct 15 - 04 Oct 22 (Renewable)