15:22 21 Nov 25
Project
10197 :
Small Hydro Power Plant Ernestina CEEE
| Project title |
Small Hydro Power Plant Ernestina CEEE
- project design document (1815 KB)
PDD appendices Appendix 1 - Ernestina_Cashflow (85 KB) Appendix 2 - Ernestina_CER Calculation sheet (104 KB)
Appendix 3 - Ernestina_Benchmark Analysis (4644 KB)
Appendix 4 - Ernestina_Common Practice Analysis (17 MB)
- registration request form (415 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
Brazil
, involved indirectly
approval (49 KB)
authorization (49 KB)
Authorized Participants: CEEE-GT ; LUMINA ENGENHRIA E CONSULTORIA LTDA |
| Other Parties Involved | n/a |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | LARGE |
| Methodologies Used |
ACM0002 ver. 16 -
Grid-connected electricity generation from renewable sources
|
| Standardized baselines used | N/A |
| Amount of Reductions | 8,992 metric tonnes CO2 equivalent per annum |
| Fee level | USD 0.0 |
| Validation Report |
VVS/VVM version:
VVS 9.0
Validation report (1281 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication | |
| Registration Date | Rejected (view history) info & rep check: concluded |
| Crediting Period | 05 Oct 15 - 04 Oct 22 (Renewable) |

project design document
Appendix 2 - Ernestina_CER Calculation sheet
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: