20:08 30 Sep 26
Project
8545 :
Installation of Waste Heat Recovery Steam Boiler at Wirajaya Packindo
| Project title |
Installation of Waste Heat Recovery Steam Boiler at Wirajaya Packindo
- project design document (1295 KB)
PDD appendices Appendix 1 - ER spreadsheet.xls (68 KB)
Appendix 2 - Gas Specs spreadsheet.xls (55 KB)
Appendix 3 - Investment analysis spreadsheet.xlsx (42 KB)
- registration request form (158 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
Indonesia
, involved indirectly
approval (197 KB)
authorization (197 KB)
Authorized Participants: PT. Wirajaya Packindo |
| Other Parties Involved |
Germany
, involved indirectly
approval (890 KB)
authorization (890 KB)
Authorized Participants: KfW (withdrawn) |
| Sectoral scopes | 4 : Manufacturing industries |
| Activity Scale | SMALL |
| Methodologies Used |
AMS-III.Q. ver. 4 -
Waste energy recovery (gas/heat/pressure) projects
|
| Standardized baselines used | N/A |
| Amount of Reductions | 56,427 metric tonnes CO2 equivalent per annum |
| Fee level | USD 9785.4 |
| Validation Report |
VVS/VVM version:
VVS 2.0
Validation report (2381 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 10/10/2013 MoC Annex 2 (Withdraw Project Participant) valid as of 08/10/2013 |
| Registration Date | 11 Dec 12 (Date of registration action 28 Jan 13) (view history) completeness check: complete info & rep check: concluded |
| Crediting Period | 11 Dec 12 - 10 Dec 22 (Fixed) |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER spreadsheet.xls
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: