15:01 17 Nov 26
Project
6607 :
Osório Wind Power Plant Project 2 (OWPPP2)
| Project title |
Osório Wind Power Plant Project 2 (OWPPP2)
- project design document (1240 KB)
PDD appendices Appendix 1 - Benchmark calculation (160 KB)
Appendix 2 - CDM Investment analysis OWPPP2 (Rev) (7236 KB)
Appendix 3 - CDM Investment analysis OWPPP2 OSORIO 2 (Rev) (7237 KB)
Appendix 4 - CDM Investment analysis OWPPP2 OSORIO 3 (Rev) (7237 KB)
Appendix 5 - CDM Investment analysis OWPPP2 SANGRADOURO 2 (Rev) (7238 KB)
Appendix 6 - CDM Investment analysis OWPPP2 SANGRADOURO 3 (Rev) (7231 KB)
Appendix 7 - Osorio CER estimative (166 KB)
- registration request form (766 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
Brazil
, involved directly
approval (1207 KB)
authorization (1207 KB)
Authorized Participants: Enerfin do Brasil - Sociedade de Energia Ltda. ; Ventos do Litoral Energia S.A. ; Ventos da Lagoa Energia S.A. |
| Other Parties Involved |
Spain
, involved indirectly
approval (544 KB)
authorization (544 KB)
Authorized Participants: Enerfin Sociedad de Energia S.L. |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | LARGE |
| Methodologies Used |
ACM0002 ver. 12 -
Consolidated baseline methodology for grid-connected electricity generation from renewable sources
|
| Standardized baselines used | N/A |
| Amount of Reductions | 69,915 metric tonnes CO2 equivalent per annum |
| Fee level | USD 12483.0 |
| Validation Report |
VVS/VVM version:
VVM 1.2
Validation report (482 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 16/04/2013 MoC Annex 2 (Add Project Participant) valid as of 01/11/2013 |
| Registration Date | 30 Oct 12 (Date of registration action 21 Jan 13) (view history) completeness check: complete info & rep check: concluded |
| Crediting Period |
30 Oct 12 - 29 Oct 19
(Renewable - Expired)
Renewal no longer possible
|
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - Benchmark calculation
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: