Registration Request for Review Form
CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 4732 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Shenmu County Xiangrong Coal Chemical Industry Co., Ltd. 25 MW Semi-coke Waste Gas Power Generation Project |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1) The DOE shall further substantiate how it has validated the suitability of input values, in particularly: (i) assumed O&M given that the unit O&M cost of the project (938 RMB/kW) is 21.5% higher than the average level of semi coke waste gas recovery projects (736 to 807 RMB/kW) ; and (ii) the annual power supply to ferrosilicon plant. In doing so, please provide detailed information on the Energy Balance Analysis of the project compiled by Xi’an Datang Electricity Design Institute. Please refer to paragraph 111 (a) & (b) of VVM v1.2. 2) The DOE shall further substantiate the appropriateness of QWCM,BL and qwcm,product given that (i) the specific waste gas production per unit of semi-coke (qwcm,product, 445 Nm3/ton) is lower than that of other semi coke waste gas recovery projects; and (ii) the annual waste gas production value (QWCM,BL, 4.45×108 Nm3) as indicated in page 28 of the validation report is inconsistent with the value (2.67×108 Nm3) indicated in page 37 of the validation report. In doing so, please provide detailed information on the waste gas balance of the semi-coke production plant. Please refer to paragraph 91 of VVM v1.2. |
|
Date | 19 Oct 11 |