01:29 13 Nov 26
Project
3909 :
Dengxinqiao 5MW Hydropower Project in Shaanxi Province
| Project title |
Dengxinqiao 5MW Hydropower Project in Shaanxi Province
- project design document (827 KB)
PDD appendices Appendix 1 - 02a_Emission reductions calculation sheet (66 KB)
Appendix 2 - 02b_IRR_Dengxinqiao (87 KB)
- registration request form (206 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
China
, involved indirectly
approval (202 KB)
authorization (202 KB)
Authorized Participants: Ziyang Dengxinqiao Hydropower Co., Ltd. |
| Other Parties Involved |
United Kingdom of Great Britain and Northern Ireland
, involved indirectly
approval (82 KB)
authorization (82 KB)
Authorized Participants: Shell Trading International Limited (withdrawn as of 09/01/2023) |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | SMALL |
| Methodologies Used |
AMS-I.D. ver. 16 -
Grid connected renewable electricity generation
|
| Standardized baselines used | N/A |
| Amount of Reductions | 13,735 metric tonnes CO2 equivalent per annum |
| Fee level | USD 0.0 |
| Validation Report |
Validation report (171 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 05/07/2012 MoC Annex 3 (Withdraw Focal Point) valid as of 08/03/2023 MoC Annex 2 (Withdraw Project Participant (Voluntary)) valid as of 09/01/2023 |
| Registration Date | 16 Dec 10 (view history) |
| Crediting Period |
16 Dec 10 - 15 Dec 17
(Renewable - Expired)
Renewal no longer possible
|
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - 02a_Emission reductions calculation sheet
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: