Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 2917 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Waste Heat Recovery Based Power generation at Vision Sponge Iron Private Ltd, West Bengal, India |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1. Further clarification is required on how the DOE has validated the suitability of the plant load factor, as in addition to the assumed working days, the calculations assume that only 4 DRI kilns would be operational at any given time (PDD, p3). 2. Clarification is required on the difference in power demand prior to the project activity at 0.9 MW with 2 DRI kilns (PDD, p2 and VR p 62) and the 16MW demand of the project activity with 5 DRI kilns (PDD, p2 and VR p64). 3. With regard to the common practice analysis, clarification is required on: (a) the difference in the processes between the 12 selected similar project activities and the 15 non-similar activities and basis of elimination from the analysis and (b) on the source of electricity for these activities. 4. The DOE is requested to clarify how it considers the baseline selected appropriate as the methodology (Table 2) states... “The electricity is obtained from a specific existing plant or from the grid ..” 5. The DOE is requested to clarify how it has taken into account the Meth Panel response to AM_CLA_0141 while validating the baseline. |
|