10:29 16 Feb 26
Project:
2551 Xinjiang Kaiduhe River Chahan Wusu Hydropower Project
- Crediting Period Renewal Request
[]
| Project |
2551: Xinjiang Kaiduhe River Chahan Wusu Hydropower Project
- project design document (988 KB)
PDD appendices Appendix 1 - ER (42 KB)
- crediting period renewal form (112 KB) |
|---|---|
| Methodologies Used |
ACM0002 ver. 17 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS 9.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 617,837 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (359 KB)
|
| Renewal Date |
16 Dec 16
(Renewable - Expired)
(view history)
completeness check: complete
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
14 Sep 16 - 13 Sep 23
Other crediting period(s): 14 Sep 09 - 13 Sep 16 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: