Registration Request for Review Form
CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 9327 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Using off gas cogeneration project in PT KPP |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1) The DOE shall further substantiate how it has validated the suitability of input values, in particular the waste gas tariff (6.08 cent/KWh) considering it appears to be an internal price for the waste gas between the owner of the project activity (PT. Krakatau Poscopower) and the owner of the project facility (PT. Krakatau Posco). In doing so, the DOE shall also explained how it has validated the relationship among the owner of the project activity (PT. Krakatau Poscopower), PT. Krakatau Daya Listrik, the owner of the project facility (PT. Krakatau Posco) and PT. Krakatau Steel. Please refer to EB 60, paragraph 93. 2) The DOE shall further substatiate how it has validated the extent of use of waste gas from the greenfield waste energy generation facility (project facility), given the fact that the alternative designs identified and analyzed under option 2 of Annex 1 are for the project activity rather than the project facility whereas the applied methodology requires the assessment of alternative design of the project facility. Please refer to ACM0012 version 4, Annex 1, option 2.. 3) The DOE shall further explain how it has validated that the use of waste gas in the absence of project activity would not be reduced due to the implementation of project activity, in particular how to verify whether there is any decrease in the utilization of waste gas by other uses at the project facility given that the values for the baseline utilization of waste gas at the project facility is to be monitored instead of being determined prior to the implementation of project activity. In doing so, an energy balance shall be established for the demand and supply of energy in all the applications covered in extended project boundary, and the energy balance shall be provided in the PDD and validated by the DOE. Please refer to ACM0012 version 4, Annex 3. 4) The DOE shall further explain how it has valdiated the baseline scenario for the heat generation, in particular how baseline alternative H9 (A new renewable energy or other waste energy based element process to supply heat) is eliminated since it is not clear whether other waste energy recovery process (e.g. waste gas fired boilers) is a creditable alternative and how the DOE has validated the elimination of that alternative. Please refer to VVM version 1.2, paragraph 83. 5) The DOE shall explain how it has validated the correctness of the formulas applied to calculate baseline emissions given that the waste gas would be partially recovered in steel plant whereas the formula applied is only applicable to the condition of no recovery of waste gas in the absence of project activity. Please refer to ACM0012 version 4, page 24 - 26. 6) The DOE shall further explained how it has validated the capping parameter fcap, in particular the ex-ante parameter Qwcm,BL (quantity of waste energy generated prior to the start of the project activity). Please refer to ACM0012 version 4, page 31.. 7) The DOE shall further substantiate how it has validated the appropriateness and conservativeness of the ex-ante grid emission factor (0.87393 tCO2e/MWh) given the fact that it is not clear whether the emission factor has been calculated based on the latest available data at the time of the validation. Please note that the emission factor of the project activity is based on data from 2007-2009 whereas the emission factor issued by Indonesian DNA on 27 March 2012 is based on data from 2008 to 2010 (as per other registered projects from Indonisia). Please refer to VVM version 1.2, paragraph 91. |
|
Date | 01 Jul 13 |