08:56 09 Oct 26
Project
8503 :
Dali Prefecture Xiangyun County Baihechang Wind Power Project
| Project title |
Dali Prefecture Xiangyun County Baihechang Wind Power Project
- project design document (1223 KB)
PDD appendices Appendix 1 - IRR sheet (115 KB)
Appendix 2 - ER Calculation sheet (72 KB)
- registration request form (511 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
China
, involved indirectly
approval (613 KB)
authorization (613 KB)
Authorized Participants: Huaneng Hydrolancang Renewables Co., Ltd. |
| Other Parties Involved |
Switzerland
, involved indirectly
approval (320 KB)
authorization (320 KB)
Authorized Participants: Vitol S.A. (withdrawn) |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | LARGE |
| Methodologies Used |
ACM0002 ver. 13 -
Consolidated baseline methodology for grid-connected electricity generation from renewable sources
|
| Standardized baselines used | N/A |
| Amount of Reductions | 83,356 metric tonnes CO2 equivalent per annum |
| Fee level | USD 15171.2 |
| Validation Report |
VVS/VVM version:
VVS 2.0
Validation report (595 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 01/12/2014 MoC Annex 2 (Withdraw Project Participant) valid as of 04/12/2014 |
| Registration Date | 12 Dec 12 (Date of registration action 18 Feb 13) (view history) completeness check: complete info & rep check: concluded |
| Crediting Period |
01 Oct 13 - 30 Sep 20
(Renewable - Expired)
Renewal no longer possible
|
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - IRR sheet
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: